Inner Corner at Base of Wall Penfield NY

The concrete masonry can be connected to the corner column with a debonded shear anchor. This type of anchor resists out-of-plane (but not in-plane) shear forces and permits movement between the steel column and concrete masonry.

Local Companies

Alta Construction Co
(516) 487-4396
8 Barstow Rd
Great Neck, NY
Hm Enterprises
(845) 688-7928
1404 Woodland Valley Rd
Phoenicia, NY
Capstone Construction Corp
(718) 855-6113
63 Flushing Ave
Brooklyn, NY
Rad & D'aprile Inc
(516) 826-9218
2128 Bellmore Ave
Bellmore, NY
Van Alphen Brothers Inc
(718) 981-7518
705 Van Duzer St
Staten Island, NY
ADS Masonry
585-698-0756
1900 university ave
rochester, NY
Juarez & Son's Masonry
(631) 348-7144
3 Leaf Ave
Central Islip, NY
Gatti & Lopez Inc
(212) 246-7656
350 W 52nd St
New York, NY
Insogna Timothy Full Masonary Service
(518) 725-2155
172 County Highway 157
Gloversville, NY
Antrim Masonry Corp
(212) 921-4001
15 Park Row
New York, NY

Provided By:

Source: MASONRY CONSTRUCTION MAGAZINE
Publication date: September 1, 2006

By Walter A. Laska

It is difficult for a mason to properly tool mortar joints at inner wall corners due to the size and shape of the jointer and the acute angle formed by the intersecting brick. As a result, the mortar joints at this location cannot be tooled neatly or compactly. Therefore, inner wall corners provide an ideal location for expansion joints.

Expansion joints located at inner corners are easy to construct and are well concealed. The expansion joint should be totally void of any material which might inhibit movement, and the reinforcement must be discontinuous at the expansion joint.

The concrete masonry can be connected to the corner column with a debonded shear anchor. This type of anchor resists out-of-plane (but not in-plane) shear forces and permits movement between the steel column and concrete masonry. Also, the connection creates a control joint in the concrete masonry backing along the column interface.
Elevation View

The space between the column and the concrete masonry should be kept free of all mortar bridging. If the column and concrete masonry are tightly bonded, any movement of the column is transferred to the masonry, possibly causing the concrete masonry backing to crack.

Flashing continuity must be maintained at the inner corners. The flashing should be cut, lapped, and set in a continuous bed of mastic to prevent water from flowing under the laps.

Click here to read full article from Masonry Construction

Related Articles
- Home Siding Tips Penfield NY
After installing window and door trim, either make flashing using a sheet metal brake or apply flashing pre-bent to the correct trim size. Nail your flashing to the wall, not to the trim, because if you put holes in the flashing, you've defeated its purpose.
- Flashing Factors Penfield NY
- Guidelines for Assembling Scaffolding Penfield NY
- Galvanized Wall Ties Penfield NY
- How Masonry Buildings Resist Earthquakes Penfield NY
- Drape Wall and Cloak Wall Penfield NY
- Flashing in Siding Installations Penfield NY
- Galvanized Wall Ties Penfield NY
- Hitachi KM 12VC Router Combination Kit Penfield NY
- High-Efficiency Products Penfield NY