Incorrect Testing Practices Yonkers NY

Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite in Yonkers. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.

Local Companies

x builders inc
347-952-1776
9031 171st st 2nd floor
jamaica, NY
James Kurpiel Iinc
201-342-3170
19 orchard street
hackensack, NJ
Access Nursing Services
(914) 747-9696
411 Manville Road
Pleasanville, NY
UNITED CRANE RIGGING DEMOLITION
718-726-6111 973-384-5904
11-14 35TH AVENUE
LIC, NY
Van Go General Contracting
(201) 387-9013
326 So. Washington Ave
Bergenfield, NJ
Olim Construction Inc.
646-294-5077
8510 34th Ave Apt.420
Jackson Heights, NY
new age roofing
718-626-0027
60-74 70 street
maspeth, NY
Scarano & Associates
(718) 222-0322
110 York Street
New York, NY
GLOBAL CONSTRUCTION
914 406 5513
838 MCLEAN AVE
YONKERS, NY
Gotham Builders
800-444-4923
203- 20 Rocky Hill Road
Bayside, NY
Data Provided by:
  

Source: THE CONCRETE PRODUCER/CONCRETE JOURNAL MAGAZINE
Publication date: November 1, 1998

By No Author

Abstract:

Erroneous results from improper testing can cause unnecessary rejection of good- quality concrete. Train your drivers to recognize some of the more common testing errors. This article is based on information presented in Down the Chute, the publication of Florida Independent Concrete and Associated Products Inc.The problem isn't confined to strength tests. Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.Some improper practices are:

  • Excessive prewetting, leaving surplus water in the container
  • Sampling from the form into which the concrete has been placed
  • Failure to remix the concrete sample in the sample container before starting the tests
  • Failure to use an aggregate correction factor
  • Use of the pressure meter to measure air content
  • Failure to firmly support the base plate
  • Base plate not large enough, allowing high-slump concrete to spill over the edge of the plate
  • Base not level
  • Dampening the slump cone and base leaving a puddle of water on the base
  • Measuring the difference between the top of the cone and the highest or lowest point on the slumped specimen
  • Fai...

Click here to read full article from The Concrete Producer

Related Articles
- Green Construction Yonkers NY
Sustainable building practices are gaining acceptance in the competitive world of concrete construction. The editors of Concrete Construction and The Concrete Producer have created a new award program to recognize the concrete community's innovative contributions to green building.
- Festool Circ Saw and Guide Rail System Yonkers NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details