Incorrect Testing Practices Poughkeepsie NY

Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite in Poughkeepsie. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.

Local Companies

ilias painting and paper hanging inc
845-282-9066
53 rodeo dr
hopewell jct, NY
Ohioville Acres
(845) 255-4554
26 Cook Lane
Gardiner, NY
New Paltz Roll Offs, Inc.
(845) 255-4745
PO Box 179
Tillson, NY
Larenco, LLC
(914) 629-0798
PO Box 1502
Highland, NY
KEM Landscaping LLC
(845) 236-7878
PO Box 265
Clintondale, NY
NORTH EASTERN CONTRACTING
914-490-4100
1127 rt.9
wappinger falls, NY
N E C NORTH EASTERN CONTRACTING
845-298-4400
1127 RT 9
wappinger falls, NY
Winter Sun Construction Inc.
(845) 256-1031
43 North Chestnut Street
New Paltz, NY
Water Solutions of New Paltz, Inc.
(845) 255-3408
PO Box 221
New Paltz, NY
Robert Waltke & Son, LLC
(845) 895-2238
46 Sycamore Drive
Wallkill, NY

Source: THE CONCRETE PRODUCER/CONCRETE JOURNAL MAGAZINE
Publication date: November 1, 1998

By No Author

Abstract:

Erroneous results from improper testing can cause unnecessary rejection of good- quality concrete. Train your drivers to recognize some of the more common testing errors. This article is based on information presented in Down the Chute, the publication of Florida Independent Concrete and Associated Products Inc.The problem isn't confined to strength tests. Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.Some improper practices are:

  • Excessive prewetting, leaving surplus water in the container
  • Sampling from the form into which the concrete has been placed
  • Failure to remix the concrete sample in the sample container before starting the tests
  • Failure to use an aggregate correction factor
  • Use of the pressure meter to measure air content
  • Failure to firmly support the base plate
  • Base plate not large enough, allowing high-slump concrete to spill over the edge of the plate
  • Base not level
  • Dampening the slump cone and base leaving a puddle of water on the base
  • Measuring the difference between the top of the cone and the highest or lowest point on the slumped specimen
  • Fai...

Click here to read full article from The Concrete Producer