Incorrect Testing Practices Orchard Park NY

Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite in Orchard Park. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.

Local Companies

John Shaflucas Architects, P.C.
(716) 636-5000
1260 Sweet Home Rd.
Buffalo, NY
Surianello General Concrete Contractors, Inc.
(716) 837-7710
635 Wyoming Ave.
Buffalo, NY
National Grid
(800) 642-4272
144 Kensington Ave.
Buffalo, NY
Huber Electric, Inc
(716) 824-8816
231 Chamberlin Dr.
Buffalo, NY
McKesson
(716) 677-7600
2700 North America Dr.
West Seneca, NY
affoedable construction co.
716 884 0305
365 hoyt street
buffalo, NY
Wendel Duchscherer
(716) 688-0766
140 John James Audubon Pkwy., Ste. 201
Amherst, NY
J.E. Arnold Development Corp., Inc.
(716) 213-0927
83 Broad St.
Tonawanda, NY
Ferguson Electric Construction Co., Inc.
(716) 852-2010
333 Ellicott St.
Buffalo, NY
Manitoba Corporation
(716) 685-7000
122 Central Ave.
Lancaster, NY

Source: THE CONCRETE PRODUCER/CONCRETE JOURNAL MAGAZINE
Publication date: November 1, 1998

By No Author

Abstract:

Erroneous results from improper testing can cause unnecessary rejection of good- quality concrete. Train your drivers to recognize some of the more common testing errors. This article is based on information presented in Down the Chute, the publication of Florida Independent Concrete and Associated Products Inc.The problem isn't confined to strength tests. Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.Some improper practices are:

  • Excessive prewetting, leaving surplus water in the container
  • Sampling from the form into which the concrete has been placed
  • Failure to remix the concrete sample in the sample container before starting the tests
  • Failure to use an aggregate correction factor
  • Use of the pressure meter to measure air content
  • Failure to firmly support the base plate
  • Base plate not large enough, allowing high-slump concrete to spill over the edge of the plate
  • Base not level
  • Dampening the slump cone and base leaving a puddle of water on the base
  • Measuring the difference between the top of the cone and the highest or lowest point on the slumped specimen
  • Fai...

Click here to read full article from The Concrete Producer

Related Articles
- Green Construction Orchard Park NY
Sustainable building practices are gaining acceptance in the competitive world of concrete construction. The editors of Concrete Construction and The Concrete Producer have created a new award program to recognize the concrete community's innovative contributions to green building.
- Festool Circ Saw and Guide Rail System Orchard Park NY