Incorrect Testing Practices Freeport NY

Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite in Freeport. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.

Local Companies

Futter Lumber Corp.
(516) 764-4445
100 Merrick Road
Rockville Centre, NY
Pinquist Tool & Die Co.,Inc
718-389-3900
63 Meserole Ave
Brooklyn, NY
Hanforged Iron Works
646-302-9335
5600 Grand Avenue
Maspeth, NY
Gotham Builders
800-444-4923
203- 20 Rocky Hill Road
Bayside, NY
Siller Stairs
(347) 491-3833
18-12 130th Street
New York, NY
MSA QUALITY,INC
(347) 499-1141
2800 COYLE
brooklyn, NY
NY Construction & Stone Inc.
718 204-6100
2145, 23 Street
Astoria, NY
UNITED CRANE RIGGING DEMOLITION
718-726-6111 973-384-5904
11-14 35TH AVENUE
LIC, NY
Durafford Construction & Waterproofing, Inc.
718-395-7668
General Contractor
E. Elmhurst, NY
Uvs Construction
(718) 554-0426
Beach 74Th St
Arverne, NY
Data Provided by:
  

Source: THE CONCRETE PRODUCER/CONCRETE JOURNAL MAGAZINE
Publication date: November 1, 1998

By No Author

Abstract:

Erroneous results from improper testing can cause unnecessary rejection of good- quality concrete. Train your drivers to recognize some of the more common testing errors. This article is based on information presented in Down the Chute, the publication of Florida Independent Concrete and Associated Products Inc.The problem isn't confined to strength tests. Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.Some improper practices are:

  • Excessive prewetting, leaving surplus water in the container
  • Sampling from the form into which the concrete has been placed
  • Failure to remix the concrete sample in the sample container before starting the tests
  • Failure to use an aggregate correction factor
  • Use of the pressure meter to measure air content
  • Failure to firmly support the base plate
  • Base plate not large enough, allowing high-slump concrete to spill over the edge of the plate
  • Base not level
  • Dampening the slump cone and base leaving a puddle of water on the base
  • Measuring the difference between the top of the cone and the highest or lowest point on the slumped specimen
  • Fai...

Click here to read full article from The Concrete Producer

Related Articles
- Green Construction Freeport NY
Sustainable building practices are gaining acceptance in the competitive world of concrete construction. The editors of Concrete Construction and The Concrete Producer have created a new award program to recognize the concrete community's innovative contributions to green building.
- Festool Circ Saw and Guide Rail System Freeport NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details