Incorrect Testing Practices Far Rockaway NY

Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite in Far Rockaway. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.

Local Companies

American Construction Corp
(212) 229-5200
44 W 18th St
New York, NY
Stephen Wang Associates
(212) 829-9494
135 E. 55th Street
New York, NY
Innovation Design and Construction of New York, inc.
(718) 982-6954
95 Goller Place
Staten Island, NY
Imperial Construction
(201) 985-3975
769 Montgomery St
Jersey City, NJ
Uvs Construction
(718) 554-0426
Beach 74Th St
Arverne, NY
CEKInt.
(917) 477-8175---(917) 657-1389
600 West 115 Street
NYC, NY
Elmont glass
516 248 8860
2145 jericho tpke
Garden city park, NY
GREAT AMERICAN COLORS LLC - CONTRACTORS
(201) 440-0505
730 GRAND AVE
RIDGEFIELD, NJ
JBS WATERPROOFING & ROOFING
(347) 583-5313
1149 white plains rd
bronx, NY
Gotham Builders
800-444-4923
203- 20 Rocky Hill Road
Bayside, NY
Data Provided by:
  

Source: THE CONCRETE PRODUCER/CONCRETE JOURNAL MAGAZINE
Publication date: November 1, 1998

By No Author

Abstract:

Erroneous results from improper testing can cause unnecessary rejection of good- quality concrete. Train your drivers to recognize some of the more common testing errors. This article is based on information presented in Down the Chute, the publication of Florida Independent Concrete and Associated Products Inc.The problem isn't confined to strength tests. Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.Some improper practices are:

  • Excessive prewetting, leaving surplus water in the container
  • Sampling from the form into which the concrete has been placed
  • Failure to remix the concrete sample in the sample container before starting the tests
  • Failure to use an aggregate correction factor
  • Use of the pressure meter to measure air content
  • Failure to firmly support the base plate
  • Base plate not large enough, allowing high-slump concrete to spill over the edge of the plate
  • Base not level
  • Dampening the slump cone and base leaving a puddle of water on the base
  • Measuring the difference between the top of the cone and the highest or lowest point on the slumped specimen
  • Fai...

Click here to read full article from The Concrete Producer

Related Articles
- Festool Circ Saw and Guide Rail System Far Rockaway NY
The TS 75 EQ excels at making precise straight cuts. It's not a framing saw, and it doesn't pretend to be; but this precise saw and guide will change the way you make long clean cuts on site.
- Green Construction Far Rockaway NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details