Incorrect Testing Practices Cortlandt Manor NY

Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite in Cortlandt Manor. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.

Local Companies

Mr. Handyman
914-461-3400
719 West Nyack Rd
West Nyack, NY
On Time Remodeling, Corp
(845) 825-4470
21A Lafayette Street
Spring Valley, NY
Custom Crushing & Materials, Inc.
914.737.6400
522 N. State Rd.
Briarcliff Manor, NY
hk contracting inc.
914 473 2355
po box 529
scrub oak, NY
jmc:contracting work corp
1914 672 7119
627 highland ave
peekskill, NY
Access Nursing Services
(914) 747-9696
411 Manville Road
Pleasanville, NY
MCFARLANE PAVING
201-327-1591
23 BRIARCLIFF RD
UPPERSADDLE RIVER, NJ
fabian nova
(914) 843-2838
32 maple av
mt kisco, NY
New York State Construction
(845) 641-3382
7 Skyline Dr
Thiells, NY
Double Deckers
(845) 356-3325
6 Melnick Dr
Monsey, NY

Source: THE CONCRETE PRODUCER/CONCRETE JOURNAL MAGAZINE
Publication date: November 1, 1998

By No Author

Abstract:

Erroneous results from improper testing can cause unnecessary rejection of good- quality concrete. Train your drivers to recognize some of the more common testing errors. This article is based on information presented in Down the Chute, the publication of Florida Independent Concrete and Associated Products Inc.The problem isn't confined to strength tests. Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.Some improper practices are:

  • Excessive prewetting, leaving surplus water in the container
  • Sampling from the form into which the concrete has been placed
  • Failure to remix the concrete sample in the sample container before starting the tests
  • Failure to use an aggregate correction factor
  • Use of the pressure meter to measure air content
  • Failure to firmly support the base plate
  • Base plate not large enough, allowing high-slump concrete to spill over the edge of the plate
  • Base not level
  • Dampening the slump cone and base leaving a puddle of water on the base
  • Measuring the difference between the top of the cone and the highest or lowest point on the slumped specimen
  • Fai...

Click here to read full article from The Concrete Producer

Related Articles
- Green Construction Cortlandt Manor NY
Sustainable building practices are gaining acceptance in the competitive world of concrete construction. The editors of Concrete Construction and The Concrete Producer have created a new award program to recognize the concrete community's innovative contributions to green building.
- Festool Circ Saw and Guide Rail System Cortlandt Manor NY
Related Local Event
Long Island Building & Facility Maintenance Show
Dates: 5/5/09 - 5/8/20
Location: David S. Mack Sports & Exhibition Complex - Hofstra University
Hempstead, NY
View Details