High Cement Content Problems Auburn NY

Portland cement gives a mortar added durability, high early strength, a consistent hardening rate, and high compressive and bond strengths. However, mortar with excessively high cement contents can affect water permeability and durability of the masonry.

Local Companies

Schneid Construction
(315) 479-9004
210 6th St
Syracuse, NY
North Main Lumber
(315) 252-8392
341 Grant Avenue Rd
Auburn, NY
Mike's Lumber Store Inc
(212) 787-6661
254 W 88th St
New York, NY
Placid Property Maintenance Corp
(845) 567-9248
334 Avenue of Americas
New Windsor, NY
Overhead Door Co of Long Island Inc
(631) 422-0666
400 Park Ave
Babylon, NY
Expert Chimney
(315) 469-5004
4800 Mcdonald Rd Ste 1
Syracuse, NY
Callahan Masonry Supply
(315) 252-7596
117 York St
Auburn, NY
T & K Hardware & Home Center
(315) 258-9481
76 State St
Auburn, NY
Erie Materials-Syracuse Inc
(315) 454-6017
101 Kuhn Rd
Syracuse, NY
Century Building Materials Llc
(631) 888-8810
275 Sunrise Hwy
Lindenhurst, NY

Provided By:

Source: MASONRY CONSTRUCTION MAGAZINE
Publication date: December 1, 1990


Portland cement gives a mortar added durability, high early strength, a consistent hardening rate, and high compressive and bond strengths. However, mortar with excessively high cement contents can affect water permeability and durability of the masonry. Water permeability is increased for three reasons. First, mortars with high cement content have greater shrinkage and more frequent shrinkage cracks. Shrinkage cracking often takes the form of evenly spaced vertical cracks in bed joints and evenly spaced horizontal cracks in head joints. The mortar may also separate or pull away from the body of the brick at the bond interface. Although high cement content mortar itself is less permeable, water can penetrate the shrinkage cracks. The second reason that high cement content mortars may increase water permeance is that these mortars are stiff and not easily workable. Because of this, good bond may not be achieved at the time of construction. Finally, the high strength (high cement content) mortars are hard (brittle) and don't easily accommodate movement of the masonry (due to environmental changes or foundation settlement) and therefore may result in cracking of the masonry wall. Cracks make the walls more susceptible to freeze-thaw deterioration even though hi...

Click here to read full article from Masonry Construction

Related Articles
- Incorrect Testing Practices Auburn NY
Conducting other tests improperly can also cause rejection of in-spec concrete at the jobsite. Have your drivers learn the correct methods for sampling concrete, measuring slump and air content, and making and curing strength-test specimens in the field. They're your first line of defense against needlessly rejected loads of concrete.
- Eliminating Swirls in Precast Panels Auburn NY
- Flue Liners for Masonry Chimneys Auburn NY
- Energy-Efficient Product Reviews Auburn NY
- Flashing in Siding Installations Auburn NY
- Home Siding Tips Auburn NY
- Galvanized Wall Ties Auburn NY
- Fibers for Permeability Auburn NY
- Handling Siding Materials Auburn NY
- Galvanized Wall Ties Auburn NY