Guidelines for Assembling Scaffolding Staten Island NY

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe.

Local Companies

T Fiore
(973) 465-1818
411 Wilson Ave
Newark, NJ
D & D Millwork Co
(973) 759-6336
10 7th Ave
Newark, NJ
Conti Enterprises
(201) 451-7386
30 Hudson St
Jersey City, NJ
Jersey Cost Gutters
(908) 289-5554
47 Pershing Ave
Elizabeth, NJ
Precision Industries
(908) 474-0777
410 Allen St
Elizabeth, NJ
Tibana Tile Inc
(718) 967-0200
205 Industrial Loop
Staten Island, NY
W W Grainger Inc
(973) 648-0040
57 Emmet St
Newark, NJ
Delisa Pallet Corporation
(973) 344-8600
91 Blanchard St
Newark, NJ
Duncan Hardware
(201) 435-1700
776 W Side Ave
Jersey City, NJ
Palin Enterprises
(908) 355-0159
107 Trumbull St
Elizabeth, NJ

Provided By:

Source: El Nuevo Constructor
Publication date: May 1, 2007

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe. It will also improve the quality of work they do from a solid platform no matter how high up they are.

Here are some very important steps to take to assure safe and proper scaffold erection.

1. Base preparation and setup

  • The key to trouble-free scaffold assembly is to begin with a firm and stable foundation.
  • Remove mud and debris from the setup area, and level the ground where the legs of the staging will stand.
  • Always use steel base plates or adjustable screw jacks placed onto wide wood base supports or mudsill planks under the first frame sets. Screw jacks will help you level the first frame sets on uneven ground.
  • Never use stacks of wood blocks, bricks, or concrete blocks to level the staging.

2. Erection of first level scaffold sections

  • Place your first frame sets onto the base blocks or mudsills and adjust each section so it's level and square.
  • Use levels and a string-line to set all the first-level sections, then nail the steel base plates into the base blocks or mudsills tosecure them.
  • Always use base plates even when setting up staging on a wood deck, concrete slab, or asphalt to keep the pipe staging legs stable.

Click here to read full article from Tools of the Trade

Related Articles
- Hiring New Employees Staten Island NY
Source: The Concrete Producer/Concrete Journal Publication date: August 1, 1995 By No Author Abstract: Recruiting, hiring and training new employees can be expensive and time-consuming. It is essential to hire the right employee the first time around. A proper selection program enables employers to obtain the best-qualified employees.
- Improving Company Loyalty Staten Island NY