Guidelines for Assembling Scaffolding Richmond Hill NY

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe.

Local Companies

Hertz Corp
(856) 665-5671
41-85 Doremus Ave
Newark, NJ
Gordon Donald A
(201) 659-0448
225 Saint Pauls Ave
Jersey City, NJ
PMT Forklift Corp
(718) 298-5270
148-14 Liberty Ave
Jamaica, NY
Dae II Supply
(718) 445-1939
3614 Union St
Flushing, NY
Garden State Window Factory
(908) 354-6300
107 Trumbull St Building J1
Elizabeth, NJ
Hertz Corp
(973) 589-8958
67-85 Doremus Ave
Newark, NJ
Conti Enterprises
(201) 451-7386
30 Hudson St
Jersey City, NJ
Hudson Appraisal Service
(201) 432-6066
781 Garfield Ave
Jersey City, NJ
Able American Contracting
(914) 260-2809
109 Mclean Ave
Yonkers, NY
Palin Enterprises
(908) 355-0159
107 Trumbull St
Elizabeth, NJ

Provided By:

Source: El Nuevo Constructor
Publication date: May 1, 2007

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe. It will also improve the quality of work they do from a solid platform no matter how high up they are.

Here are some very important steps to take to assure safe and proper scaffold erection.

1. Base preparation and setup

  • The key to trouble-free scaffold assembly is to begin with a firm and stable foundation.
  • Remove mud and debris from the setup area, and level the ground where the legs of the staging will stand.
  • Always use steel base plates or adjustable screw jacks placed onto wide wood base supports or mudsill planks under the first frame sets. Screw jacks will help you level the first frame sets on uneven ground.
  • Never use stacks of wood blocks, bricks, or concrete blocks to level the staging.

2. Erection of first level scaffold sections

  • Place your first frame sets onto the base blocks or mudsills and adjust each section so it's level and square.
  • Use levels and a string-line to set all the first-level sections, then nail the steel base plates into the base blocks or mudsills tosecure them.
  • Always use base plates even when setting up staging on a wood deck, concrete slab, or asphalt to keep the pipe staging legs stable.

Click here to read full article from Tools of the Trade

Related Articles
- Improving Company Loyalty Richmond Hill NY
Company loyalty isn't something that can be demanded from workers. Paying a competitive salary, providing a great benefit package, and supplying first-rate equipment certainly helps, but these points alone do not bring loyalty.
- Hiring New Employees Richmond Hill NY