Guidelines for Assembling Scaffolding New Hyde Park NY

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe.

Local Companies

Crown Industrial Supply Corp
(201) 656-5515
Wayne St
Jersey City, NJ
PMT Forklift Corp
(718) 298-5270
148-14 Liberty Ave
Jamaica, NY
Able American Contracting
(914) 260-2809
109 Mclean Ave
Yonkers, NY
Montauk Contracting Corp
(718) 461-0341
11914 28th Ave
Flushing, NY
Best Concrete Mix Corp
(718) 539-5946
3510 College Point Blvd
Flushing, NY
One On One General Contracting
(201) 946-0400
707 Bergen Ave
Jersey City, NJ
Three Star Building Material Inc
(718) 658-3150
14707 Liberty Ave
Jamaica, NY
Hardwood Lumber & Mi
(914) 969-2000
72 Alexander St
Yonkers, NY
Midway Electric
(914) 375-3753
1453 Nepperhan Ave
Yonkers, NY
Dae II Supply
(718) 445-1939
3614 Union St
Flushing, NY

Provided By:

Source: El Nuevo Constructor
Publication date: May 1, 2007

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe. It will also improve the quality of work they do from a solid platform no matter how high up they are.

Here are some very important steps to take to assure safe and proper scaffold erection.

1. Base preparation and setup

  • The key to trouble-free scaffold assembly is to begin with a firm and stable foundation.
  • Remove mud and debris from the setup area, and level the ground where the legs of the staging will stand.
  • Always use steel base plates or adjustable screw jacks placed onto wide wood base supports or mudsill planks under the first frame sets. Screw jacks will help you level the first frame sets on uneven ground.
  • Never use stacks of wood blocks, bricks, or concrete blocks to level the staging.

2. Erection of first level scaffold sections

  • Place your first frame sets onto the base blocks or mudsills and adjust each section so it's level and square.
  • Use levels and a string-line to set all the first-level sections, then nail the steel base plates into the base blocks or mudsills tosecure them.
  • Always use base plates even when setting up staging on a wood deck, concrete slab, or asphalt to keep the pipe staging legs stable.

Click here to read full article from Tools of the Trade

Related Articles
- Improving Company Loyalty New Hyde Park NY
Company loyalty isn't something that can be demanded from workers. Paying a competitive salary, providing a great benefit package, and supplying first-rate equipment certainly helps, but these points alone do not bring loyalty.
- Hiring New Employees New Hyde Park NY