Guidelines for Assembling Scaffolding Monroe NY

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe.

Local Companies

Kamen Stephen
(516) 681-3600
114 Wayne St
Jericho, NY
Ect Leasing Inc
(516) 621-9191
2300 Northern Blvd
Greenvale, NY
Cavin Leasing Corp
(631) 246-5066
29 Oak Run
Stony Brook, NY
Atlas Capital
(212) 986-3388
633 3rd Ave
New York, NY
Sparrow Construction Corp
(718) 798-9041
3743 White Plains Rd Frnt 1
Bronx, NY
Churchill Technology Finance Llc
(516) 496-2225
6800 Jericho Tpke
Syosset, NY
Bielmier Leasing Inc
(716) 632-7807
6470 Main St
Buffalo, NY
Commercial Equities
(516) 741-0200
1 Old Country Rd Ste 497
Carle Place, NY
Interpool
(212) 986-3388
633 3rd Ave Rm 2702
New York, NY
Trac Lease Inc
(212) 986-3388
633 3rd Ave
New York, NY

Provided By:

Source: El Nuevo Constructor
Publication date: May 1, 2007

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe. It will also improve the quality of work they do from a solid platform no matter how high up they are.

Here are some very important steps to take to assure safe and proper scaffold erection.

1. Base preparation and setup

  • The key to trouble-free scaffold assembly is to begin with a firm and stable foundation.
  • Remove mud and debris from the setup area, and level the ground where the legs of the staging will stand.
  • Always use steel base plates or adjustable screw jacks placed onto wide wood base supports or mudsill planks under the first frame sets. Screw jacks will help you level the first frame sets on uneven ground.
  • Never use stacks of wood blocks, bricks, or concrete blocks to level the staging.

2. Erection of first level scaffold sections

  • Place your first frame sets onto the base blocks or mudsills and adjust each section so it's level and square.
  • Use levels and a string-line to set all the first-level sections, then nail the steel base plates into the base blocks or mudsills tosecure them.
  • Always use base plates even when setting up staging on a wood deck, concrete slab, or asphalt to keep the pipe staging legs stable.

Click here to read full article from Tools of the Trade

Related Articles
- Improving Company Loyalty Monroe NY
Company loyalty isn't something that can be demanded from workers. Paying a competitive salary, providing a great benefit package, and supplying first-rate equipment certainly helps, but these points alone do not bring loyalty.
- Hiring New Employees Monroe NY