Guidelines for Assembling Scaffolding Melville NY

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe.

Local Companies

Heavy Equip Repair Corp of Ny Inc
(718) 995-4300
15054 183rd St
Jamaica, NY
Shipper & Shipper
(212) 599-5600
420 Lexington Ave Rm 2400
New York, NY
Leaseplan USA
(845) 223-9995
162 Martin Rd
Lagrangeville, NY
Blockwell Funding Corp
(516) 624-2800
50 Gerard St
Huntington, NY
Long Island Tool Town
(631) 957-2800
69 Montauk Hwy
Lindenhurst, NY
Cerco Products, Inc.
631-249-9299
80 Sherwood Ave.
Farmingdale, NY
Bison Coml Leasing
(631) 845-7700
560 Broadhollow Rd
Melville, NY
Cook Transportation
(516) 997-2896
59 New York Ave
Westbury, NY
Wireless Solutions
(914) 304-4250
75 S Broadway
White Plains, NY
Westbury Trailer Leasing & Repair
(631) 231-5171
70B Emjay Blvd
Brentwood, NY

Provided By:

Source: El Nuevo Constructor
Publication date: May 1, 2007

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe. It will also improve the quality of work they do from a solid platform no matter how high up they are.

Here are some very important steps to take to assure safe and proper scaffold erection.

1. Base preparation and setup

  • The key to trouble-free scaffold assembly is to begin with a firm and stable foundation.
  • Remove mud and debris from the setup area, and level the ground where the legs of the staging will stand.
  • Always use steel base plates or adjustable screw jacks placed onto wide wood base supports or mudsill planks under the first frame sets. Screw jacks will help you level the first frame sets on uneven ground.
  • Never use stacks of wood blocks, bricks, or concrete blocks to level the staging.

2. Erection of first level scaffold sections

  • Place your first frame sets onto the base blocks or mudsills and adjust each section so it's level and square.
  • Use levels and a string-line to set all the first-level sections, then nail the steel base plates into the base blocks or mudsills tosecure them.
  • Always use base plates even when setting up staging on a wood deck, concrete slab, or asphalt to keep the pipe staging legs stable.

Click here to read full article from Tools of the Trade

Related Articles
- Improving Company Loyalty Melville NY
Company loyalty isn't something that can be demanded from workers. Paying a competitive salary, providing a great benefit package, and supplying first-rate equipment certainly helps, but these points alone do not bring loyalty.
- Hiring New Employees Melville NY