Guidelines for Assembling Scaffolding Long Island City NY

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe.

Local Companies

W W Grainger Inc
(973) 648-0040
57 Emmet St
Newark, NJ
Jersey City Fork Lift
(201) 795-0163
817 Tonnele Ave
Jersey City, NJ
Peterson Tool Rental
(914) 965-7418
1256 Saw Mill River Rd
Yonkers, NY
United Rentals
(718) 460-7199
2844 College Point Blvd
Flushing, NY
Garden State Window Factory
(908) 354-6300
107 Trumbull St Building J1
Elizabeth, NJ
Vanbro Industries
(718) 698-1100
1900 South Ave
Staten Island, NY
Atlas Building Supply
(973) 344-2544
465 Raymond Blvd
Newark, NJ
Sorrentino Electric Inc
(201) 656-5196
375 2nd St
Jersey City, NJ
Domus Appraisals Inc
(914) 337-0182
15 Hancock Ave
Yonkers, NY
Dae II Supply
(718) 445-1939
3614 Union St
Flushing, NY

Provided By:

Source: El Nuevo Constructor
Publication date: May 1, 2007

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe. It will also improve the quality of work they do from a solid platform no matter how high up they are.

Here are some very important steps to take to assure safe and proper scaffold erection.

1. Base preparation and setup

  • The key to trouble-free scaffold assembly is to begin with a firm and stable foundation.
  • Remove mud and debris from the setup area, and level the ground where the legs of the staging will stand.
  • Always use steel base plates or adjustable screw jacks placed onto wide wood base supports or mudsill planks under the first frame sets. Screw jacks will help you level the first frame sets on uneven ground.
  • Never use stacks of wood blocks, bricks, or concrete blocks to level the staging.

2. Erection of first level scaffold sections

  • Place your first frame sets onto the base blocks or mudsills and adjust each section so it's level and square.
  • Use levels and a string-line to set all the first-level sections, then nail the steel base plates into the base blocks or mudsills tosecure them.
  • Always use base plates even when setting up staging on a wood deck, concrete slab, or asphalt to keep the pipe staging legs stable.

Click here to read full article from Tools of the Trade

Related Articles
- Hiring New Employees Long Island City NY
Source: The Concrete Producer/Concrete Journal Publication date: August 1, 1995 By No Author Abstract: Recruiting, hiring and training new employees can be expensive and time-consuming. It is essential to hire the right employee the first time around. A proper selection program enables employers to obtain the best-qualified employees.
- Improving Company Loyalty Long Island City NY