Guidelines for Assembling Scaffolding Gloversville NY

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe.

Local Companies

Andon Leasing Ltd
(631) 499-1600
66 Harned Rd Ste 4
Commack, NY
Budget Truck Rental
(516) 931-3475
589 S Broadway
Hicksville, NY
Northeastern Leasing & Finance Corp
(716) 773-2044
2695 Grand Island Blvd
Grand Island, NY
Saratoga Rowing Center Inc
(518) 584-7844

Saratoga Springs, NY
Pound Ridge Equipment Rental
(914) 666-8304
353 Adams St
Bedford Hills, NY
Equicapital
(212) 244-1806
26 Broadway
New York, NY
Borden Leasing Corp
(718) 786-0993
5035 56th Rd
Maspeth, NY
Adapt Financial Services
(518) 766-4006
10 Kids Ln
Castleton On Hudson, NY
Cbi Leasing
(518) 459-8480
125 Wolf Rd Ste 111
Albany, NY
Hudson Genl Svces Div
(718) 656-6555
Jfk Airport
Jamaica, NY

Provided By:

Source: El Nuevo Constructor
Publication date: May 1, 2007

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe. It will also improve the quality of work they do from a solid platform no matter how high up they are.

Here are some very important steps to take to assure safe and proper scaffold erection.

1. Base preparation and setup

  • The key to trouble-free scaffold assembly is to begin with a firm and stable foundation.
  • Remove mud and debris from the setup area, and level the ground where the legs of the staging will stand.
  • Always use steel base plates or adjustable screw jacks placed onto wide wood base supports or mudsill planks under the first frame sets. Screw jacks will help you level the first frame sets on uneven ground.
  • Never use stacks of wood blocks, bricks, or concrete blocks to level the staging.

2. Erection of first level scaffold sections

  • Place your first frame sets onto the base blocks or mudsills and adjust each section so it's level and square.
  • Use levels and a string-line to set all the first-level sections, then nail the steel base plates into the base blocks or mudsills tosecure them.
  • Always use base plates even when setting up staging on a wood deck, concrete slab, or asphalt to keep the pipe staging legs stable.

Click here to read full article from Tools of the Trade

Related Articles
- Hiring New Employees Gloversville NY
Source: The Concrete Producer/Concrete Journal Publication date: August 1, 1995 By No Author Abstract: Recruiting, hiring and training new employees can be expensive and time-consuming. It is essential to hire the right employee the first time around. A proper selection program enables employers to obtain the best-qualified employees.
- Improving Company Loyalty Gloversville NY