Guidelines for Assembling Scaffolding Camillus NY

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe.

Local Companies

Spano James V Inc
(315) 487-2000
555 State Fair Blvd
Syracuse, NY
Charles Haller Enterprises
(315) 433-0011
4079 New Court Ave
Syracuse, NY
Atlas Bituminous Co Inc
(315) 457-2394
173 Farrell Rd
Syracuse, NY
Rochester Industrial Supply
(315) 423-6213
333 E Washington St
Syracuse, NY
Johnstone Supply
(315) 479-8800
1200 Burnet Ave
Syracuse, NY
J C Smith Inc
(315) 428-9903
345 Peat St
Syracuse, NY
Gar Con Construction
(315) 484-1065
4718 Cedarvale Rd
Syracuse, NY
Luber Supply Inc
(315) 487-8787
690 State Fair Blvd
Syracuse, NY
Eastwood Lumber
(315) 463-5236
401 N Midler Ave
Syracuse, NY
Clark Equipment Rental
(315) 472-7607
515 E Brighton Ave
Syracuse, NY

Provided By:

Source: El Nuevo Constructor
Publication date: May 1, 2007

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe. It will also improve the quality of work they do from a solid platform no matter how high up they are.

Here are some very important steps to take to assure safe and proper scaffold erection.

1. Base preparation and setup

  • The key to trouble-free scaffold assembly is to begin with a firm and stable foundation.
  • Remove mud and debris from the setup area, and level the ground where the legs of the staging will stand.
  • Always use steel base plates or adjustable screw jacks placed onto wide wood base supports or mudsill planks under the first frame sets. Screw jacks will help you level the first frame sets on uneven ground.
  • Never use stacks of wood blocks, bricks, or concrete blocks to level the staging.

2. Erection of first level scaffold sections

  • Place your first frame sets onto the base blocks or mudsills and adjust each section so it's level and square.
  • Use levels and a string-line to set all the first-level sections, then nail the steel base plates into the base blocks or mudsills tosecure them.
  • Always use base plates even when setting up staging on a wood deck, concrete slab, or asphalt to keep the pipe staging legs stable.

Click here to read full article from Tools of the Trade

Related Articles
- Improving Company Loyalty Camillus NY
Company loyalty isn't something that can be demanded from workers. Paying a competitive salary, providing a great benefit package, and supplying first-rate equipment certainly helps, but these points alone do not bring loyalty.
- Hiring New Employees Camillus NY