Guidelines for Assembling Scaffolding Buffalo NY

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe.

Local Companies

ABC Hardware Rental Special Events
(716) 803-7000
3336 Bailey Ave
Buffalo, NY
Schaub Equipment Rental Inc
(716) 824-1555
2902 Seneca St
Buffalo, NY
Fastenal Co
(716) 447-0320
1500 Military Rd
Buffalo, NY
North State Supply Co Inc
(716) 875-8093
1122 Military Rd
Buffalo, NY
K-D Supply Corp
716 693-7600
641 Erie Ave. PO Box 549
North Tonawanda, NY
ABC Hardware Rental Special Events
(716) 837-7300
2507 Niagara Falls Blvd
Buffalo, NY
Norman Bodekor Co
(716) 668-2500
3180 Transit Rd
Buffalo, NY
United Rentals
(716) 565-1330
4811 Transit Rd
Buffalo, NY
Horizon Builders
(716) 625-9579
255 North Dr
Buffalo, NY
Allied Building Products Inc
(716) 634-5671
3401 Genesee St
Buffalo, NY

Provided By:

Source: El Nuevo Constructor
Publication date: May 1, 2007

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe. It will also improve the quality of work they do from a solid platform no matter how high up they are.

Here are some very important steps to take to assure safe and proper scaffold erection.

1. Base preparation and setup

  • The key to trouble-free scaffold assembly is to begin with a firm and stable foundation.
  • Remove mud and debris from the setup area, and level the ground where the legs of the staging will stand.
  • Always use steel base plates or adjustable screw jacks placed onto wide wood base supports or mudsill planks under the first frame sets. Screw jacks will help you level the first frame sets on uneven ground.
  • Never use stacks of wood blocks, bricks, or concrete blocks to level the staging.

2. Erection of first level scaffold sections

  • Place your first frame sets onto the base blocks or mudsills and adjust each section so it's level and square.
  • Use levels and a string-line to set all the first-level sections, then nail the steel base plates into the base blocks or mudsills tosecure them.
  • Always use base plates even when setting up staging on a wood deck, concrete slab, or asphalt to keep the pipe staging legs stable.

Click here to read full article from Tools of the Trade

Related Articles
- Hiring New Employees Buffalo NY
Source: The Concrete Producer/Concrete Journal Publication date: August 1, 1995 By No Author Abstract: Recruiting, hiring and training new employees can be expensive and time-consuming. It is essential to hire the right employee the first time around. A proper selection program enables employers to obtain the best-qualified employees.
- Improving Company Loyalty Buffalo NY