Guidelines for Assembling Scaffolding Amityville NY

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe.

Local Companies

J B Equipment & Hardwood Sales Corp
(718) 298-8000
10828 Guy R Brewer Blvd
Jamaica, NY
Tabso Textile Mfrs of Drop Cloths
(718) 291-7070
17806 104th Ave
Jamaica, NY
Actus Lend Lease
(315) 775-4040
5 Lewis Ave
Fort Drum, NY
Zemo Leasing
(845) 353-5339
127 S Broadway
Nyack, NY
US Bancorp
(718) 568-3548
900 South Ave
Staten Island, NY
Cerco Products, Inc.
631-249-9299
80 Sherwood Ave.
Farmingdale, NY
Heavy Equip Repair Corp of Ny Inc
(718) 995-4300
15054 183rd St
Jamaica, NY
Granrich Capital Corp
(516) 334-2200
99 Jericho Tpke
Jericho, NY
Evans & White Ace Hardware
(315) 265-4350
1 Maple St
Potsdam, NY
John J Lease Realtors Inc
(845) 883-7700
550 State Route 299
Highland, NY

Provided By:

Source: El Nuevo Constructor
Publication date: May 1, 2007

Frame scaffolding, made from welded steel tubing (also called "pipe staging") is only safe if it is erected properly. Once the staging is erected with the proper planks, it should be like standing on a floor —which will make your crew more comfortable and safe. It will also improve the quality of work they do from a solid platform no matter how high up they are.

Here are some very important steps to take to assure safe and proper scaffold erection.

1. Base preparation and setup

  • The key to trouble-free scaffold assembly is to begin with a firm and stable foundation.
  • Remove mud and debris from the setup area, and level the ground where the legs of the staging will stand.
  • Always use steel base plates or adjustable screw jacks placed onto wide wood base supports or mudsill planks under the first frame sets. Screw jacks will help you level the first frame sets on uneven ground.
  • Never use stacks of wood blocks, bricks, or concrete blocks to level the staging.

2. Erection of first level scaffold sections

  • Place your first frame sets onto the base blocks or mudsills and adjust each section so it's level and square.
  • Use levels and a string-line to set all the first-level sections, then nail the steel base plates into the base blocks or mudsills tosecure them.
  • Always use base plates even when setting up staging on a wood deck, concrete slab, or asphalt to keep the pipe staging legs stable.

Click here to read full article from Tools of the Trade