Framer's Guide to Engineered Lumber Wappingers Falls NY

Engineered lumber in Wappingers Falls does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Fastenal- Fishkill
845-897-4721
115 Old Route 9 Fishkill, NY, 12524
Fishkill, NY
LOWE'S OF NEWBURGH, NY
845 567-2860
1239 ROUTE 300 NEWBURGH, NY, 12550
Newburgh, NY
Rim Supply
845-565-5220
2 Johnes Street
Newburgh, NY
Lowe's
(845) 298-4720
1941 South Road
Poughkeepsie, NY
Poughkeepsie - D
(845) 471-9300
635 Dutchess Turnpike
Poughkeepsie, NY
Williams Lumber Inc
(845) 266-3435
1900 Salt Point Turn Pike
Salt Point, NY
J & R TOOL CO
(845) 279-6169
3651 DANBURY RD, RTE 6 BREWSTER, NY, 10509
Brewster, NY
LOWE'S OF POUGHKEEPSIE, N. Y.
845 298-4720
GALLERIA MALL 790 SOUTH RD POUGHKEEPSIE, NY, 12601
Poughkeepsie, NY
The Home Depot
(845)279-9669
80 Independence Way SE
Brewster, NY
Newburgh Mall
(845) 566-2300
1401 Route 300
Newburgh, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade