Framer's Guide to Engineered Lumber Wantagh NY

Engineered lumber in Wantagh does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Roberts Plywood Co.
800-422-4944
45 North Industry Court
Deer Park, NY
Costello's Ace Hardware
(516) 644-2450
3899 Hempstead Tpke, Pathmark
Bethpage, NY
The Home Depot
(718)358-9600
131-35 Avery Avenue
Flushing, NY
The Home Depot
(718)827-9568
579 Gateway Drive
Brooklyn, NY
Kmart 9418 / Cross Merch
(516) 295-4186
253-01 Rockaway Blvd
Rosedale, NY
EXOTIC WOODS USA
(631) 651-8651
698 Fort Salonga Rd
Northport, NY
Suburban Mills
631-351-6445
16 Railroad St
Huntington Station, NY
County Line Do it Best Hdwe
631-427-4455
173 West Hills Road
Huntington Station, NY
The Home Depot
(516)997-9595
86 Jericho Turnpike
Jericho, NY
The Home Depot
(516)823-0700
101 Green Acres Road
Valley Stream, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade