Framer's Guide to Engineered Lumber Vestal NY

Engineered lumber in Vestal does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Lowe's
(607) 770-9800
225 Sycamore Road
Vestal, NY
Fastenal- Binghamton
607-724-4177
441 Court Street Binghampton, NY, 13904
Binghampton, NY
Home Central
(607) 785-3307
199 Stage Road
Vestal, NY
The Home Depot
(607)785-8614
798 Main St
Johnson City, NY
Kmart 3521 / Cross Merch
(607) 772-6618
33 W State St
Binghamton, NY
Lowe's
(607) 762-1000
1318 Upper Front Street
Binghamton, NY
ABC Supply Co.,Inc/Endwell
607-786-3316
3125 Pearl Street Endwell, NY, 13760
Endwell, NY
Fastenal- Vestal
607-729-7153
320 N Jensen Rd Vestal, NY, 13850
Vestal, NY
Andre And Son True Value
(570) 278-1131
17150 State Route 706
Montrose, PA
Kmart 7375 / Cross Merch
(607) 754-5920
527 Endicott Plaza
Endicott, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade