Framer's Guide to Engineered Lumber Utica NY

Engineered lumber in Utica does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Lowe's
(315) 793-3812
710 Horatio Street
Utica, NY
Ace Hardware of Rome
(315) 336-7800
115 Black River Blvd
Rome, NY
Doyle Hardware Co Inc
315-723-7398
100 First St
Utica, NY
The Home Depot
(315)797-5300
545 French Road
New Hartford, NY
Sangertown Sq
(315) 793-3900
Rt 5 & 5A
New Hartford, NY
Lowe's
(315) 709-3000
1230 Erie Blvd. West
Rome, NY
Lowe's of New Hartford
315-351-4242
4699 Middle Settlement Road New Hartford, NY, 13413
New Hartford, NY
George Lumber
315-823-1709
525 East Mill St
Little Falls, NY
Rome General Lbr Co Inc
(315) 336-2600
529 Erie Blvd W
Rome, NY
Lowe's
(315) 867-5520
182 Lowes Boulevard
Herkimer, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Fighting Fastener Corrosion Utica NY
Deck building used to be simpler. At the lumberyard, you’d load up on CCA-treated 2-by stock for the floor system, 6x6s for the posts, and whatever the budget allowed for the decking — anything from 1x6 pressure treated to more-expensive 1x4 Doug fir.
- Home Exterior Ideas Utica NY
- Fasteners and Connectors Utica NY
- Green Building Products Utica NY
- Green Products - Product Reviews Utica NY
- Festool Circ Saw and Guide Rail System Utica NY
- Forklift Operation Utica NY
- Frugal House Framing Utica NY
- Ergonomic Principles of Forklift Design Utica NY
- Engineered Lumber Utica NY