Framer's Guide to Engineered Lumber Spencerport NY

Engineered lumber in Spencerport does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Mayer Hardware, Inc
(585) 288-7665
226 Winton Rd N
Rochester, NY
Fastenal- Rochester
585-424-2860
2856 West Henrietta Rd Rochester, NY, 14623
Rochester, NY
LOWE'S OF WEBSTER, NY
585 787-7900
900 FIVE MILE LINE ROAD WEBSTER, NY, 14580
Webster, NY
Beyond Hardware
(585) 377-5540
2155 Penfield Road
Penfield, NY
Lowe's
(585) 424-1340
2350 Marketplace Drive
Rochester, NY
Woodcraft - Rochester
585-292-9690
Henrietta Plaza
Rochester, NY
Wm Hamilton & Son Inc
(585) 538-2270
229 North St
Caledonia, NY
Fastenal- Rochester
585-247-1460
50 Spencerport Road Rochester, NY, 14606
Rochester, NY
Crocker's Ace Hardware
(585) 768-2360
8457 North St Rd
Le Roy, NY
The Home Depot
(585)427-0390
770 Jefferson Road
Rochester, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade