Framer's Guide to Engineered Lumber South Richmond Hill NY

Engineered lumber in South Richmond Hill does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Pintchik
(718) 783-3333
478 Bergen St
Brooklyn, NY
Fastenal- Mineola
516-294-7132
315-B Roslyn Road Mineola, NY, 11501
Mineola, NY
Brite Hardware Auto Parts, Inc
718-849-8121
112-15 Jamaica Avenue
Jamaica, NY
The Home Depot
(516)997-9595
86 Jericho Turnpike
Jericho, NY
Kmart 7654 / Cross Merch
(718) 671-5377
300 Baychester Ave
Bronx, NY
Monster Woodshop
888-506-6678
607 18th Street
Brooklyn, NY
Lowe's
(718) 682-9027
2171 Forest Avenue
Staten Island, NY
Bruno's Hardware
718-858-5250
95 Court St
Brooklyn, NY
The Home Depot
(201)963-6513
180 Twelfth Street
Jersey City, NJ
Kmart 9420 / Cross Merch
(718) 430-9439
1998 Bruckner Blvd
Bronx, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade