Framer's Guide to Engineered Lumber South Richmond Hill NY

Engineered lumber in South Richmond Hill does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

S & E Building Matls Co
(718) 436-4923
744 Mcdonald Ave, between Ditmas Ave and Cortelyou Rd.
Brooklyn, NY
Sunset Hardware
(718) 748-0960
8111 5th Ave
Brooklyn, NY
Best Hardware & Mill Supplies
516-354-0529
406 Jericho Turnpike
Floral Park, NY
The Home Depot
(212)888-1512
980 3rd Ave
New York, NY
Hicksville - A
(516) 733-3000
195 N Broadway
Hicksville, NY
Monster Woodshop
888-506-6678
607 18th Street
Brooklyn, NY
Costello's Ace Hardware
(516) 644-2450
3899 Hempstead Tpke, Pathmark
Bethpage, NY
ACE TOOL REPAIR INC
(516) 783-8899
2201 WANTAGH AVE WANTAGH, NY, 11793
Wantagh, NY
Canarsie Lumber, Inc
718-649-2200
826 Rockaway Parkway
Brooklyn, NY
The Home Depot
(516)823-0700
101 Green Acres Road
Valley Stream, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade