Framer's Guide to Engineered Lumber South Ozone Park NY

Engineered lumber in South Ozone Park does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Rainbow Ycs
(212) 517-7500
1449 1st Ave
New York, NY
Fastenal- Mineola
516-294-7132
315-B Roslyn Road Mineola, NY, 11501
Mineola, NY
Costello's Ace Hardware
(516) 798-0680
1330 Hicksville Rd, Marshalls
Massapequa, NY
Canarsie Lumber, Inc
718-649-2200
826 Rockaway Parkway
Brooklyn, NY
Newport Centre Mall
(201) 420-5300
50 Mall Dr West
Jersey City, NJ
Monster Woodshop
888-506-6678
607 18th Street
Brooklyn, NY
ACE TOOL REPAIR INC
(516) 783-8899
2201 WANTAGH AVE WANTAGH, NY, 11793
Wantagh, NY
LOWE'S OF N. BERGEN, N.J.
201 662-0932
7801 TONNELLE AVENUE NORTH BERGEN, NJ, 07047
North Bergen, NJ
Cityline Hardware
718-277-1079
1081 Liberty Ave
Brooklyn, NY
Queens Lumber Company, Inc
718-539-0400
34-41 College Point Blvd
Flushing, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade