Framer's Guide to Engineered Lumber Schenectady NY

Engineered lumber in Schenectady does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

ABC Supply Co.,Inc/Albany
518-489-5581
15 Kairnes Street Albany, NY, 12205
Albany, NY
Fastenal- Mechanicville
518-899-5835
2381 Route 9 Bldg 2 Suite 4 Mechanicville, NY, 12118
Mechanicville, NY
A. Phillips Hardware
518-861-5364
Osborne Corners
Altamont, NY
Pfeil Hardware
518-687-0014
63 Third St
Troy, NY
Colonie Ctr Mall
(518) 454-3000
1425 Central Ave
Albany, NY
Robinson's Hardware
(518) 456-7383
1874 Western Ave, 1 mile West of Crossgates Mall
Albany, NY
Fastenal- Albany
518-465-4234
1074 Broadway Albany, NY, 12204
Albany, NY
Lowe's of Glenville
518-952-8789
93 Freemans Bridge Rd Glenville, NY, 12302
Glenville, NY
A. Phillips Hardware
518-439-9943
235 Delaware Ave
Delmar, NY
The Home Depot
(518)843-1275
135 Hanaford Plaza
Amsterdam, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade