Framer's Guide to Engineered Lumber Sayville NY

Engineered lumber in Sayville does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Roberts Plywood Co.
800-422-4944
45 North Industry Court
Deer Park, NY
Ace Hardware
(631) 751-9500
Three Vlg Shpg Ctr, 1366 Rte 25 A, King Kullen Shopping Center
East Setauket, NY
Ferreteria Valois Pagan
(787) 844-2460
1478 Ave Tito Castro
Ponce, NY
The Home Depot
(631)424-9170
839 New York Avenue
Huntington, NY
South Shore Mall
(631) 969-2000
1701 Sunrise Hwy
Bay Shore, NY
EXOTIC WOODS USA
(631) 651-8651
698 Fort Salonga Rd
Northport, NY
Suburban Mills
631-351-6445
16 Railroad St
Huntington Station, NY
Comercial Berrios Inc
(787) 739-2831
Barcelo #64
Cidra, NY
Brinkmann True Value Hdwe
(631) 567-6879
15 Foster Ave
Sayville, NY
The Home Depot
(631)493-2320
65 Crooked Hill Road
Commack, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Fighting Fastener Corrosion Sayville NY
Deck building used to be simpler. At the lumberyard, you’d load up on CCA-treated 2-by stock for the floor system, 6x6s for the posts, and whatever the budget allowed for the decking — anything from 1x6 pressure treated to more-expensive 1x4 Doug fir.
- Ergonomic Principles of Forklift Design Sayville NY
- Frugal House Framing Sayville NY
- Green Products - Product Reviews Sayville NY
- Festool Circ Saw and Guide Rail System Sayville NY
- Forklift Operation Sayville NY
- Home Exterior Ideas Sayville NY
- Green Building Products Sayville NY
- Fasteners and Connectors Sayville NY
- Engineered Lumber Sayville NY