Framer's Guide to Engineered Lumber Rome NY

Engineered lumber in Rome does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Lowe's of New Hartford
315-351-4242
4699 Middle Settlement Road New Hartford, NY, 13413
New Hartford, NY
Kime's Do it Best Home Center
315-697-3232
3381 Seneca Turnpike
Canastota, NY
Kime True Value Hdwe
(315) 363-8302
21 Seneca Ave
Oneida Castle, NY
Lowe's
(315) 366-3100
1200 Lowe'S Drive
Oneida, NY
Kmart 4362 / Cross Merch
(315) 736-0876
4645 Commercial Dr
New Hartford, NY
Lowe's
(315) 709-3000
1230 Erie Blvd. West
Rome, NY
LOWE'S OF UTICA, N. Y.
315 793-3812
710 HORATIO STREET UTICA, NY, 13502
Utica, NY
Rome Power & Hardware Inc.
315-336-7378
1217 Erie Blvd West
Rome, NY
The Home Depot
(315)797-5300
545 French Road
New Hartford, NY
Oneida - Sears Hardware Stores
(315) 363-7733
1032 Oneida Plaza Dr
Oneida, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Home Exterior Ideas Rome NY
The William E. Poole Collection of polyurethane decorative and structural millwork includes balustrade systems, cupolas, newel posts, window and door trims, louvers, gables, dormers, and cornice details reflecting a wide variety of traditional architectural styles.
- Green Building Products Rome NY
- Forklift Operation Rome NY
- Frugal House Framing Rome NY
- Ergonomic Principles of Forklift Design Rome NY
- Fasteners and Connectors Rome NY
- Fighting Fastener Corrosion Rome NY
- Engineered Lumber Rome NY
- Festool Circ Saw and Guide Rail System Rome NY
- Green Products - Product Reviews Rome NY