Framer's Guide to Engineered Lumber Rochester NY

Engineered lumber in Rochester does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Lowe's
(315) 903-9962
1605 Macedon Parkway
Macedon, NY
Fastenal- Rochester
585-247-1460
50 Spencerport Road Rochester, NY, 14606
Rochester, NY
LOWE'S OF GREECE, NY
585 453-7500
3150 WEST RIDGE ROAD ROCHESTER, NY, 14626
Rochester, NY
The Home Depot
(585)427-0390
770 Jefferson Road
Rochester, NY
Marketplace Mall
(585) 475-8255
10 Miracle Mile Dr
Rochester, NY
Woodcraft - Rochester
585-292-9690
Henrietta Plaza
Rochester, NY
Fastenal- Ontario
315-524-4255
1238 Route 104 Ontario, NY, 14519
Ontario, NY
Fastenal- Victor
585-924-1910
6280 Rt 96 Ste B Victor, NY, 14564
Victor, NY
Abrasive Tool Corp
585-254-4500
1555 Emerson Street
Rochester, NY
Lowe's
(585) 453-7500
3150 West Ridge Road
Rochester, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Home Exterior Ideas Rochester NY
The William E. Poole Collection of polyurethane decorative and structural millwork includes balustrade systems, cupolas, newel posts, window and door trims, louvers, gables, dormers, and cornice details reflecting a wide variety of traditional architectural styles.
- Fasteners and Connectors Rochester NY
- Festool Circ Saw and Guide Rail System Rochester NY
- Green Building Products Rochester NY
- Forklift Operation Rochester NY
- Fighting Fastener Corrosion Rochester NY
- Green Products - Product Reviews Rochester NY
- Ergonomic Principles of Forklift Design Rochester NY
- Engineered Lumber Rochester NY
- Frugal House Framing Rochester NY