Framer's Guide to Engineered Lumber Port Jefferson Station NY

Engineered lumber in Port Jefferson Station does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Roberts Plywood Co.
800-422-4944
45 North Industry Court
Deer Park, NY
DYNAMITE TOOL CO
(631) 563-8181
1551 SMITHTOWN AVENUE BOHEMIA, NY, 11716
Bohemia, NY
Ferreteria Del Hogar True Value Hdwe.
(787) 793-1874
5 Tabonuco Caparra Ind Park
Guaynabo, NY
The Home Depot
(631)286-0210
20 Farber Drive
Bellport, NY
Kmart 3862 / Cross Merch
(631) 567-3060
5151 Sunrise Hwy
Bohemia, NY
EXOTIC WOODS USA
(631) 651-8651
698 Fort Salonga Rd
Northport, NY
Suburban Mills
631-351-6445
16 Railroad St
Huntington Station, NY
Fastenal- Holbrook
631-218-3485
920 Lincoln Ave Holbrook, NY, 11741
Holbrook, NY
Agnew & Taylor True Value
(631) 588-8720
501 Hawkins Ave
Lake Ronkonkoma, NY
The Home Depot
(631)242-0215
475 Commack Road
Deer Park, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Ergonomic Principles of Forklift Design Port Jefferson Station NY
An aching back, strained muscles, and stiff joints are just a few symptoms of fatigue a forklift operator might accumulate in a day of sitting or standing, wrestling a steering wheel, operating hydraulic controls, and climbing on and off the forklift. That's why forklift designers are taking ergonomics principles more seriously than ever.
- Frugal House Framing Port Jefferson Station NY
- Home Exterior Ideas Port Jefferson Station NY
- Festool Circ Saw and Guide Rail System Port Jefferson Station NY
- Fighting Fastener Corrosion Port Jefferson Station NY
- Forklift Operation Port Jefferson Station NY
- Green Building Products Port Jefferson Station NY
- Fasteners and Connectors Port Jefferson Station NY
- Engineered Lumber Port Jefferson Station NY
- Green Products - Product Reviews Port Jefferson Station NY