Framer's Guide to Engineered Lumber Peekskill NY

Engineered lumber in Peekskill does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Lowe's of Clarkstown
845-351-3500
100 Overlook Blvd Nanuet, NY, 10954
Nanuet, NY
On Time Supply
845-352-8600
14 Melnick Dr Monsey, NY, 10952
Monsey, NY
Pomona Do it Best Hardware
845-364-5678
1581 Route 202
Pomona, NY
The Home Depot
(845)781-4307
254 Larkin Drive
Monroe, NY
Kmart 9462 / Cross Merch
(845) 561-2334
374 Windsor Hwy Rte 32
Vails Gate, NY
Fastenal- Newburgh
845-564-1552
13 Jeanne Drive Newburgh, NY, 12550
Newburgh, NY
LOWE'S OF NEWBURGH, NY
845 567-2860
1239 ROUTE 300 NEWBURGH, NY, 12550
Newburgh, NY
Herb Lack Paints & Hardware
845-358-0293
124 Main Street
Nyack, NY
The Home Depot
(845)896-0824
450 State Route 9
Fishkill, NY
The Home Depot
(845)561-6540
1220 Route 300
Newburgh, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Ergonomic Principles of Forklift Design Peekskill NY
An aching back, strained muscles, and stiff joints are just a few symptoms of fatigue a forklift operator might accumulate in a day of sitting or standing, wrestling a steering wheel, operating hydraulic controls, and climbing on and off the forklift. That's why forklift designers are taking ergonomics principles more seriously than ever.
- Green Products - Product Reviews Peekskill NY
- Home Exterior Ideas Peekskill NY
- Forklift Operation Peekskill NY
- Festool Circ Saw and Guide Rail System Peekskill NY
- Frugal House Framing Peekskill NY
- Fasteners and Connectors Peekskill NY
- Engineered Lumber Peekskill NY
- Green Building Products Peekskill NY
- Fighting Fastener Corrosion Peekskill NY