Framer's Guide to Engineered Lumber Orchard Park NY

Engineered lumber in Orchard Park does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Certainly Wood, Inc.
716-655-0206
13000 Route 78
East Aurora, NY
RC Tonewoods
716-873-6043
1109 Military Road
Buffalo, NY
Woodcraft - Buffalo, NY
(716) 674-0795
1900 Ridge Road
West Seneca, NY
Gui's Lumber & Home Center
(716) 592-4100
14085 S Cascade Dr, Old Rte 219
Springville, NY
Tonawanda - Sears Hardware Stores
(716) 877-5512
1764 Sheridan Dr
Tonawanda, NY
Advantage Trim & Lumber Co
716-827-3915
601 Ohio St
Buffalo, NY
Niagara Lumber and Wood Products, Inc.
716-655-2142
47 Elm Street
East Aurora,, NY
Rockler Woodworking and Hardware #11
(716) 631-8922
5085 Transit Rd
Buffalo, NY
Fastenal- Cheektowaga
716-684-2293
3232 Union Rd Cheektowga, NY, 14227
Cheektowga, NY
Valu Home Center #25
716-496-5005
Corner Rts 16 & 39
Chaffee, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Home Exterior Ideas Orchard Park NY
The William E. Poole Collection of polyurethane decorative and structural millwork includes balustrade systems, cupolas, newel posts, window and door trims, louvers, gables, dormers, and cornice details reflecting a wide variety of traditional architectural styles.
- Fasteners and Connectors Orchard Park NY
- Ergonomic Principles of Forklift Design Orchard Park NY
- Frugal House Framing Orchard Park NY
- Green Products - Product Reviews Orchard Park NY
- Forklift Operation Orchard Park NY
- Green Building Products Orchard Park NY
- Fighting Fastener Corrosion Orchard Park NY
- Festool Circ Saw and Guide Rail System Orchard Park NY
- Engineered Lumber Orchard Park NY