Framer's Guide to Engineered Lumber Oakland Gardens NY

Engineered lumber in Oakland Gardens does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

MORGAN TOOL RENTALS INC
(718) 963-4100
500 MORGAN AVENUE BROOKLYN, NY, 11222
Brooklyn, NY
Prince Lumber Company
212-777-1150
404 West 15th St
New York, NY
Kings Material Company Inc.
718-438-5232
3707 15th Avenue
Brooklyn, NY
The Home Depot
(718)358-9600
131-35 Avery Avenue
Flushing, NY
Kmart 9419 / Cross Merch
(718) 821-2412
66-26 Metropolitan Ave
Middle Vlg, NY
Monster Woodshop
888-506-6678
607 18th Street
Brooklyn, NY
Costello's Ace Hardware
(631) 694-1100
1102 Broadhollow Rd, Corner of Rte. 110 & Main St.
Farmingdale, NY
Best Hardware & Mill Supplies
516-354-0529
406 Jericho Turnpike
Floral Park, NY
Trio Hardware
516-935-8385
1032 C Old Country Rd
Plainview, NY
The Home Depot
(718)278-9031
50-10 Northern Blvd
Long Island City, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Ergonomic Principles of Forklift Design Oakland Gardens NY
An aching back, strained muscles, and stiff joints are just a few symptoms of fatigue a forklift operator might accumulate in a day of sitting or standing, wrestling a steering wheel, operating hydraulic controls, and climbing on and off the forklift. That's why forklift designers are taking ergonomics principles more seriously than ever.
- Festool Circ Saw and Guide Rail System Oakland Gardens NY
- Frugal House Framing Oakland Gardens NY
- Green Products - Product Reviews Oakland Gardens NY
- Green Building Products Oakland Gardens NY
- Fighting Fastener Corrosion Oakland Gardens NY
- Engineered Lumber Oakland Gardens NY
- Forklift Operation Oakland Gardens NY
- Home Exterior Ideas Oakland Gardens NY
- Fasteners and Connectors Oakland Gardens NY