Framer's Guide to Engineered Lumber North Tonawanda NY

Engineered lumber in North Tonawanda does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

RC Tonewoods
716-873-6043
1109 Military Road
Buffalo, NY
Woodcraft - Buffalo, NY
(716) 674-0795
1900 Ridge Road
West Seneca, NY
Hectors Hardware Clinton, Inc.
716-823-1700
1955 Clinton Street
Buffalo, NY
Drews True Value Hardware
(716) 875-3300
2245 Delaware Ave
Buffalo, NY
Kmart 4176 / Cross Merch
(716) 685-2020
2055 Walden Ave
Cheektowaga, NY
Advantage Trim & Lumber Co
716-827-3915
601 Ohio St
Buffalo, NY
Rockler Woodworking and Hardware #11
(716) 631-8922
5085 Transit Rd
Buffalo, NY
Fastenal- Cheektowaga
716-684-2293
3232 Union Rd Cheektowga, NY, 14227
Cheektowga, NY
Hector's Hardware Inc
716-877-6200
26 Lansing St
Buffalo, NY
Mckinley Mall
(716) 821-5700
S 3701 Mckinley Pkwy
Buffalo, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles