Framer's Guide to Engineered Lumber North Babylon NY

Engineered lumber in North Babylon does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Roberts Plywood Co.
800-422-4944
45 North Industry Court
Deer Park, NY
Lowe's
(631) 927-3470
90 Price Parkway
Farmingdale, NY
Fastenal- Mineola
516-294-7132
315-B Roslyn Road Mineola, NY, 11501
Mineola, NY
Botto Brothers Hardware
(516) 931-0816
231 Broadway
Hicksville, NY
Kmart 3862 / Cross Merch
(631) 567-3060
5151 Sunrise Hwy
Bohemia, NY
EXOTIC WOODS USA
(631) 651-8651
698 Fort Salonga Rd
Northport, NY
Suburban Mills
631-351-6445
16 Railroad St
Huntington Station, NY
ABC Supply Co.,Inc/Bohemia
631-285-7710
2950 Veterans Memorial Hwy Bohemia, NY, 11716
Bohemia, NY
LOWE'S OF GARDEN CITY, NY
516 794-6531
700 DIBBLEE DRIVE GARDEN CITY, NY, 11530
Garden City, NY
Caguas Commercial
(787) 743-4001
Carretera 189 Km 2.5
Caguas, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Green Building Products North Babylon NY
The manufacturer's latest toilet technology is Kohler's precision-engineered Class Six flushing. The unit optimizes the power of jet action to remove bulk waste with 100% of the flushing water being fed through the rim, blending bulk removal and bowl washing.
- Ergonomic Principles of Forklift Design North Babylon NY
- Home Exterior Ideas North Babylon NY
- Fasteners and Connectors North Babylon NY
- Green Products - Product Reviews North Babylon NY
- Frugal House Framing North Babylon NY
- Engineered Lumber North Babylon NY
- Fighting Fastener Corrosion North Babylon NY
- Festool Circ Saw and Guide Rail System North Babylon NY
- Forklift Operation North Babylon NY