Framer's Guide to Engineered Lumber New Windsor NY

Engineered lumber in New Windsor does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Lowe's
(845) 834-5000
650 Route 299
Highland, NY
Fastenal- Fishkill
845-897-4721
115 Old Route 9 Fishkill, NY, 12524
Fishkill, NY
LOWE'S OF NEWBURGH, NY
845 567-2860
1239 ROUTE 300 NEWBURGH, NY, 12550
Newburgh, NY
B. Rose Hardware
845-446-2061
313 Main Street
Highland Falls, NY
Kmart 3372 / Cross Merch
(845) 297-1246
1895 South Road
Poughkeepsie, NY
Williams Lumber Inc
(845) 221-2751
908 Route 82
Hopewell Junction, NY
ABC Supply Co.,Inc/Newburgh
845-561-5565
150 S. Water Street Newburgh, NY, 12550
Newburgh, NY
Lowe's of Chester
845-572-2400
3924 Summerville Way Chester, NY, 10918
Chester, NY
Pro Tool Warehouse
845-294-2645
110 North Church St
Goshen, NY
Webers Hardware & Paint
845-895-2781
22 Wallkill Ave
Wallkill, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade