Framer's Guide to Engineered Lumber Nanuet NY

Engineered lumber in Nanuet does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

TOOL NUT
(914) 621-0200
247 MAHOPAC AVENUE YORKTOWN HEIGHTS, NY, 10598
Yorktown Heights, NY
Herb Lack Paints & Hardware
845-358-0293
124 Main Street
Nyack, NY
The Home Depot
(845)781-4307
254 Larkin Drive
Monroe, NY
The Home Depot
(914)690-9745
150 Midland Ave
Port Chester, NY
Kmart 7654 / Cross Merch
(718) 671-5377
300 Baychester Ave
Bronx, NY
Lowe's of Clarkstown
845-351-3500
100 Overlook Blvd Nanuet, NY, 10954
Nanuet, NY
Greenwood Lumber
845-477-2699
702 Jersey Ave
Greenwood Lake, NY
The Home Depot
(718)862-9800
1806 E Gunhill Rd
Bronx, NY
The Home Depot
(914)593-7110
1 Saw Mill River Road
Hawthorne, NY
A W MEYER CO INC
(201) 945-5500
509 BROAD AVENUE RIDGEFIELD, NJ, 07657
Ridgefield, NJ

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade