Framer's Guide to Engineered Lumber Manhasset NY

Engineered lumber in Manhasset does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Roberts Plywood Co.
800-422-4944
45 North Industry Court
Deer Park, NY
Pintchik
(718) 783-3333
478 Bergen St
Brooklyn, NY
Costello's Ace Hardware
(631) 243-2220
770-14 Grand Blvd
Deer Park, NY
ICW/INDUSTRIAL COMPONENTS
(914) 777-3245
626 Third Street Mamaroneck, NY, 10543
Mamaroneck, NY
Bergenfield - Sears Hardware Stores
(201) 244-9160
450 S Washington Ave
Bergenfield, NJ
Monster Woodshop
888-506-6678
607 18th Street
Brooklyn, NY
Suburban Mills
631-351-6445
16 Railroad St
Huntington Station, NY
Costello's Ace Hardware
(631) 321-1316
515 Montauk Hwy, Big Lots and Pathmark
West Babylon, NY
GENERAL MACHINERY INC
(212) 226-7835
358 BROOME STREET NEW YORK, NY, 10013
New York, NY
Tonys Hardware & Tool Rental
12414 Liberty Ave
S Richmond Hill, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade