Framer's Guide to Engineered Lumber Lockport NY

Engineered lumber in Lockport does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Rockler Woodworking and Hardware #11
(716) 631-8922
5085 Transit Rd
Buffalo, NY
Gui's Lumber & Home Center
(716) 297-2000
8940 Porter Rd, NIAGARA FALLS AIRPORT
Niagara Falls, NY
Valu Home Center #38
716-656-5054
4875 Transit Rd
Lancaster, NY
Valu Home Center #14
716-689-0720
5433 Transit Rd
Clarence, NY
7 Walden Galleria Dr
(716) 686-6255
2000 Walden Ave
Cheektowaga, NY
RC Tonewoods
716-873-6043
1109 Military Road
Buffalo, NY
TOOL RANCH
3857 WALDEN AVENUE LANCASTER, NY, 14086
Lancaster, NY
Hectors Hardware Of Depew
716-681-3811
6231 Transit Road
Depew, NY
Valu Home Center #19
716-694-8155
4264 Delaware Ave
Tonawanda, NY
The Home Depot
(716)871-8800
2100 Elmwood Avenue
Buffalo, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Fasteners and Connectors Lockport NY
Some of the fasteners and connectors on the market are engineered for better performance in a variety of materials, including popular wood alternatives like PVC and composite trims, while other new introductions help solve common fastener and connector issues.
- Green Building Products Lockport NY
- Fighting Fastener Corrosion Lockport NY
- Forklift Operation Lockport NY
- Engineered Lumber Lockport NY
- Home Exterior Ideas Lockport NY
- Festool Circ Saw and Guide Rail System Lockport NY
- Ergonomic Principles of Forklift Design Lockport NY
- Frugal House Framing Lockport NY
- Green Products - Product Reviews Lockport NY