Framer's Guide to Engineered Lumber Liverpool NY

Engineered lumber in Liverpool does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Skaneateles Town Square
(315) 685-5748
61 Fennell St, 3 BLOCKS NORTH OF THE VILLAGE
Skaneateles, NY
Village Hardware
(315) 638-4026
43 E Genesee St
Baldwinsville, NY
Fastenal- Liverpool
315-451-3807
7184 Morgan Rd Liverpool, NY, 13090
Liverpool, NY
T&K Lumber Co, Inc.
315-689-3005
170 Route 5 West Elbridge, NY, 13060
Elbridge, NY
Shoppngtown Mall
(315) 445-3800
3649 Erie Blvd E
De Witt, NY
Salt City Hardware
(315) 362-3254
325 Nottingham Rd
Syracuse, NY
Village Ace Hardware
(315) 834-2275
2701 Erie Dr
Weedsport, NY
Lowe's
(315) 350-8961
5701 East Circle Drive
Cicero, NY
Lowe's- Clay
315-652-1200
3856 State Route 31 Liverpool, NY, 13090
Liverpool, NY
The Home Depot
(315)449-2920
5814 Bridge St
East Syracuse, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade