Framer's Guide to Engineered Lumber Little Neck NY

Engineered lumber in Little Neck does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Suburban Mills
631-351-6445
16 Railroad St
Huntington Station, NY
LOWE'S OF GARDEN CITY, NY
516 794-6531
700 DIBBLEE DRIVE GARDEN CITY, NY, 11530
Garden City, NY
County Line Do it Best Hdwe
631-427-4455
173 West Hills Road
Huntington Station, NY
A W MEYER CO INC
(201) 945-5500
509 BROAD AVENUE RIDGEFIELD, NJ, 07657
Ridgefield, NJ
Hicksville - A
(516) 733-3000
195 N Broadway
Hicksville, NY
Monster Woodshop
888-506-6678
607 18th Street
Brooklyn, NY
Fastenal- Brooklyn
718-609-9435
190 West St. Section 1B Brooklyn, NY, 11222
Brooklyn, NY
Mar Jam Supply, Inc.
718-388-6465
20 Rewe Street
Brooklyn, NY
The Home Depot
(914)235-7575
55 Weyman Ave
New Rochelle, NY
Lake Success S/C
(516) 574-5500
1400 Union Tpke
New Hyde Park, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Fighting Fastener Corrosion Little Neck NY
Deck building used to be simpler. At the lumberyard, you’d load up on CCA-treated 2-by stock for the floor system, 6x6s for the posts, and whatever the budget allowed for the decking — anything from 1x6 pressure treated to more-expensive 1x4 Doug fir.
- Engineered Lumber Little Neck NY
- Ergonomic Principles of Forklift Design Little Neck NY
- Green Products - Product Reviews Little Neck NY
- Frugal House Framing Little Neck NY
- Home Exterior Ideas Little Neck NY
- Green Building Products Little Neck NY
- Festool Circ Saw and Guide Rail System Little Neck NY
- Forklift Operation Little Neck NY
- Fasteners and Connectors Little Neck NY