Framer's Guide to Engineered Lumber Howard Beach NY

Engineered lumber in Howard Beach does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

KASS INDUSTRIAL SUPPLY/Bronx
(718) 299-6060
1715 Washington Ave Bronx, NY, 10457
Bronx, NY
Howard Supply
212-971-3127
399 8th Avenue
New York, NY
Best Hardware & Mill Supplies
516-354-0529
406 Jericho Turnpike
Floral Park, NY
The Home Depot
(718)507-9007
73-01 25th Avenue
East Elmhurst, NY
Queens -Sears Hardware Stores
(718) 776-8156
22005 Hillside Ave
Queens Vlg, NY
Monster Woodshop
888-506-6678
607 18th Street
Brooklyn, NY
Brickman Outlets Inc
(212) 777-1500
125 W 3rd St, The Blue Note
New York, NY
Morales Department Store
718-299-6668
1862 Jerome Ave
Bronx, NY
Active Lumber
718-492-5000
6119 7th Avenue
Brooklyn, NY
The Home Depot
(516)997-9595
86 Jericho Turnpike
Jericho, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Ergonomic Principles of Forklift Design Howard Beach NY
An aching back, strained muscles, and stiff joints are just a few symptoms of fatigue a forklift operator might accumulate in a day of sitting or standing, wrestling a steering wheel, operating hydraulic controls, and climbing on and off the forklift. That's why forklift designers are taking ergonomics principles more seriously than ever.
- Festool Circ Saw and Guide Rail System Howard Beach NY
- Forklift Operation Howard Beach NY
- Fasteners and Connectors Howard Beach NY
- Green Building Products Howard Beach NY
- Engineered Lumber Howard Beach NY
- Frugal House Framing Howard Beach NY
- Fighting Fastener Corrosion Howard Beach NY
- Green Products - Product Reviews Howard Beach NY
- Home Exterior Ideas Howard Beach NY