Framer's Guide to Engineered Lumber Hauppauge NY

Engineered lumber in Hauppauge does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Roberts Plywood Co.
800-422-4944
45 North Industry Court
Deer Park, NY
Lowe's
(631) 954-9001
800 Sunrise Highway
Bay Shore, NY
Fastenal- Holbrook
631-218-3485
920 Lincoln Ave Holbrook, NY, 11741
Holbrook, NY
County Line Do it Best Hdwe
631-427-4455
173 West Hills Road
Huntington Station, NY
Huntington Sq Mall
(631) 462-2100
4000 Jericho Tpke
E Northport, NY
EXOTIC WOODS USA
(631) 651-8651
698 Fort Salonga Rd
Northport, NY
Suburban Mills
631-351-6445
16 Railroad St
Huntington Station, NY
Lowe's
(631) 927-3470
90 Price Parkway
Farmingdale, NY
Costello's Ace Hardware
(516) 798-0680
1330 Hicksville Rd, Marshalls
Massapequa, NY
The Home Depot
(631)789-9200
1101 Sunrise Highway
Copiague, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Fasteners and Connectors Hauppauge NY
Some of the fasteners and connectors on the market are engineered for better performance in a variety of materials, including popular wood alternatives like PVC and composite trims, while other new introductions help solve common fastener and connector issues.
- Green Building Products Hauppauge NY
- Home Exterior Ideas Hauppauge NY
- Engineered Lumber Hauppauge NY
- Ergonomic Principles of Forklift Design Hauppauge NY
- Frugal House Framing Hauppauge NY
- Green Products - Product Reviews Hauppauge NY
- Fighting Fastener Corrosion Hauppauge NY
- Festool Circ Saw and Guide Rail System Hauppauge NY
- Forklift Operation Hauppauge NY