Framer's Guide to Engineered Lumber Glen Oaks NY

Engineered lumber in Glen Oaks does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Suburban Mills
631-351-6445
16 Railroad St
Huntington Station, NY
Sunset Hardware
(718) 748-0960
8111 5th Ave
Brooklyn, NY
Herman's Has Everything
800-273-4376
1070 Linwood Street Brooklyn, NY, 11208
Brooklyn, NY
Best Hardware & Mill Supplies
516-354-0529
406 Jericho Turnpike
Floral Park, NY
The Home Depot
(718)507-9007
73-01 25th Avenue
East Elmhurst, NY
Monster Woodshop
888-506-6678
607 18th Street
Brooklyn, NY
Costello's Ace Hardware
(631) 321-1316
515 Montauk Hwy, Big Lots and Pathmark
West Babylon, NY
Fastenal- Bronx
718-409-9411
1600 Stillwell Bronx, NY, 10461
Bronx, NY
Airport Hardware
(201) 935-7780
111 Moonachie Ave
Moonachie, NJ
Idlewild Do it Best Hardware
718-528-1075
157-17 Rockaway Blvd
Jamaica, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Fighting Fastener Corrosion Glen Oaks NY
Deck building used to be simpler. At the lumberyard, you’d load up on CCA-treated 2-by stock for the floor system, 6x6s for the posts, and whatever the budget allowed for the decking — anything from 1x6 pressure treated to more-expensive 1x4 Doug fir.
- Festool Circ Saw and Guide Rail System Glen Oaks NY
- Green Building Products Glen Oaks NY
- Ergonomic Principles of Forklift Design Glen Oaks NY
- Fasteners and Connectors Glen Oaks NY
- Home Exterior Ideas Glen Oaks NY
- Green Products - Product Reviews Glen Oaks NY
- Engineered Lumber Glen Oaks NY
- Forklift Operation Glen Oaks NY
- Frugal House Framing Glen Oaks NY