Framer's Guide to Engineered Lumber Flushing NY

Engineered lumber in Flushing does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Palmer Ace Hardware
(201) 262-0900
940 Kinderkamack Rd, Charlie Browns Restaurant in Oradell
River Edge, NJ
ICW/INDUSTRIAL COMPONENTS
(914) 777-3245
626 Third Street Mamaroneck, NY, 10543
Mamaroneck, NY
Lowe's
(201) 231-6040
150 Route 17 North
E. Rutherford, NJ
The Home Depot
(201)226-9929
99 State Route 17 North
Lodi, NJ
White Plains - A
(914) 644-1400
100 Main St
White Plains, NY
Monster Woodshop
888-506-6678
607 18th Street
Brooklyn, NY
Lucky Hardware Inc
(201) 436-8210
160 Broadway
Bayonne, NJ
LOWE'S OF N. BERGEN, N.J.
201 662-0932
7801 TONNELLE AVENUE NORTH BERGEN, NJ, 07047
North Bergen, NJ
Lowe's
(973) 341-8102
265 Mclean Boulevard
Paterson, NJ
The Home Depot
(718)818-9334
545 Targee Street
Staten Island, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade