Framer's Guide to Engineered Lumber Farmingville NY

Engineered lumber in Farmingville does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Roberts Plywood Co.
800-422-4944
45 North Industry Court
Deer Park, NY
Oakdale Paint & Hardware
(631) 567-9705
1460 Montauk Hwy
Oakdale, NY
Comercial Tortuguero, Inc
(787) 858-2965
Carr #2 Km 41.3
Vega Baja, NY
Kmart 3862 / Cross Merch
(631) 567-3060
5151 Sunrise Hwy
Bohemia, NY
Smith-Haven Mall
(631) 361-5259
4 Smith Haven Mall
Lake Grove, NY
EXOTIC WOODS USA
(631) 651-8651
698 Fort Salonga Rd
Northport, NY
Suburban Mills
631-351-6445
16 Railroad St
Huntington Station, NY
DYNAMITE TOOL CO
(631) 563-8181
1551 SMITHTOWN AVENUE BOHEMIA, NY, 11716
Bohemia, NY
Islip True Value Hardware
(631) 581-0951
445 Main St
Islip, NY
5137 Nesconset Hwy
(631) 476-0438
Rr 347
Pt Jefferson, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Fighting Fastener Corrosion Farmingville NY
Deck building used to be simpler. At the lumberyard, you’d load up on CCA-treated 2-by stock for the floor system, 6x6s for the posts, and whatever the budget allowed for the decking — anything from 1x6 pressure treated to more-expensive 1x4 Doug fir.
- Engineered Lumber Farmingville NY
- Frugal House Framing Farmingville NY
- Festool Circ Saw and Guide Rail System Farmingville NY
- Fasteners and Connectors Farmingville NY
- Home Exterior Ideas Farmingville NY
- Forklift Operation Farmingville NY
- Green Building Products Farmingville NY
- Ergonomic Principles of Forklift Design Farmingville NY
- Green Products - Product Reviews Farmingville NY