Framer's Guide to Engineered Lumber Fairport NY

Engineered lumber in Fairport does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Woodcraft - Rochester
585-292-9690
Henrietta Plaza
Rochester, NY
J. Kozel/Tool Ranch
(585) 436-9807
1150 Scottsville Rd Rochester, NY, 14624
Rochester, NY
Secor Do it Best Hardware
315-524-4052
6260 Furnace Road
Ontario, NY
Beyond Hardware
(585) 377-5540
2155 Penfield Road
Penfield, NY
The Home Depot
(585)385-4090
750 Panorama Trails So
Rochester, NY
Bristol Valley Hardwoods of Rochester
585-229-5695
4054 Bristol Valley Road Route 64
Canandaigua, NY
Mayer Hardware, Inc
(585) 288-7665
226 Winton Rd N
Rochester, NY
LOWE'S OF CANANDAIGUA, NY
585 919-3300
4200 RECREATION DRIVE CANANDAIGUA, NY, 14424
Canandaigua, NY
Clifton Springs Hardware Inc
(315) 462-2826
6 W Main St
Clifton Springs, NY
The Home Depot
(585)247-0220
2361 Buffalo Road
Rochester, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Home Exterior Ideas Fairport NY
The William E. Poole Collection of polyurethane decorative and structural millwork includes balustrade systems, cupolas, newel posts, window and door trims, louvers, gables, dormers, and cornice details reflecting a wide variety of traditional architectural styles.
- Green Products - Product Reviews Fairport NY
- Forklift Operation Fairport NY
- Engineered Lumber Fairport NY
- Ergonomic Principles of Forklift Design Fairport NY
- Festool Circ Saw and Guide Rail System Fairport NY
- Green Building Products Fairport NY
- Fighting Fastener Corrosion Fairport NY
- Fasteners and Connectors Fairport NY
- Frugal House Framing Fairport NY