Framer's Guide to Engineered Lumber Elmira NY

Engineered lumber in Elmira does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

LOWE'S OF BIG FLATS, N.Y.
607 739-6106
913 COUNTY RD, RT 64 ELMIRA, NY, 14903
Elmira, NY
Valu Home Centers
607-936-9900
Ames Plaza 1000 Victory H
Painted Post, NY
Valu Home Centers
607-732-3200
1105 Broadway Ave
Elmira, NY
Horns True Value Hardware
(570) 888-0032
503 N Keystone Ave
Sayre, PA
Kmart 9166 / Cross Merch
(570) 888-9613
2900 Elmira Street
Sayre, PA
Lowe's
(607) 739-6106
913 County Rd., Route 64
Elmira, NY
The Corning Building Co
607-936-9921
Cbc Plaza, Park Ave
Corning, NY
Tom's Hardware & Feed Inc.
607-565-2736
615-617 Cayuta Avenue
Waverly, NY
Draper True Value Hdw
(570) 537-6566
5277 Main St
Millerton, PA
The Home Depot
(607)936-1400
3160 Silverback Lane
Painted Post, NY

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Ergonomic Principles of Forklift Design Elmira NY
An aching back, strained muscles, and stiff joints are just a few symptoms of fatigue a forklift operator might accumulate in a day of sitting or standing, wrestling a steering wheel, operating hydraulic controls, and climbing on and off the forklift. That's why forklift designers are taking ergonomics principles more seriously than ever.
- Festool Circ Saw and Guide Rail System Elmira NY
- Fasteners and Connectors Elmira NY
- Green Products - Product Reviews Elmira NY
- Frugal House Framing Elmira NY
- Green Building Products Elmira NY
- Fighting Fastener Corrosion Elmira NY
- Forklift Operation Elmira NY
- Engineered Lumber Elmira NY
- Home Exterior Ideas Elmira NY