Framer's Guide to Engineered Lumber East Meadow NY

Engineered lumber in East Meadow does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Roberts Plywood Co.
800-422-4944
45 North Industry Court
Deer Park, NY
Costello's Ace Hardware
(631) 925-5500
822 Fort Salonga Rd, Walgreens
Northport, NY
Ace Hardware of Commack
(631) 670-6540
2160B Jericho Tpke.
Commack, NY
Metropolitan Distributors Corp
718-657-0100
108-20 Merrick Blvd
Jamaica, NY
The Home Depot
(718)641-5500
11220 Rockaway Blvd
South Ozone Park, NY
EXOTIC WOODS USA
(631) 651-8651
698 Fort Salonga Rd
Northport, NY
Suburban Mills
631-351-6445
16 Railroad St
Huntington Station, NY
144-17 Hardware, Inc.
(718) 528-5762
14417 243rd St
Rosedale, NY
A-Z Apartment Building Supply
718-620-0202
829 Westchester Avenue
Bronx, NY
Five Star Lumber & Home Ctrs
516-872-2700
210 E Merrick Rd
Valley Stream, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Fighting Fastener Corrosion East Meadow NY
Deck building used to be simpler. At the lumberyard, you’d load up on CCA-treated 2-by stock for the floor system, 6x6s for the posts, and whatever the budget allowed for the decking — anything from 1x6 pressure treated to more-expensive 1x4 Doug fir.
- Frugal House Framing East Meadow NY
- Green Building Products East Meadow NY
- Fasteners and Connectors East Meadow NY
- Festool Circ Saw and Guide Rail System East Meadow NY
- Forklift Operation East Meadow NY
- Home Exterior Ideas East Meadow NY
- Ergonomic Principles of Forklift Design East Meadow NY
- Green Products - Product Reviews East Meadow NY
- Engineered Lumber East Meadow NY