Framer's Guide to Engineered Lumber Corning NY

Engineered lumber in Corning does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Local Companies

Fastenal- Elmira
607-737-9062
1336 College Ave Elmira, NY, 14901
Elmira, NY
Horseheads Do it center
607-739-5616
124 North Main Street
Horseheads, NY
Morgan & Margraff Lbr.supp.co.
814-258-5223
Condensary Lane
Elkland, PA
Horseheads - D
(607) 739-3661
1020 Center St
Horseheads, NY
Bath - Auth Hometown
(607) 776-6659
7172 Ret 54
Bath, NY
Garreson Lumber Company
607-566-8558
7201 Craig Rd.
Bath, NY
LOWE'S OF BIG FLATS, N.Y.
607 739-6106
913 COUNTY RD, RT 64 ELMIRA, NY, 14903
Elmira, NY
Valu Home Centers
607-732-3200
1105 Broadway Ave
Elmira, NY
The Home Depot
(607)936-1400
3160 Silverback Lane
Painted Post, NY
Kmart 9589 / Cross Merch
(607) 776-4117
420 W Morris St
Bath, NY
Data Provided by:
  

Provided By:

Source: TOOLS OF THE TRADE Magazine
Publication date: March 1, 2003

By Scott Woelful

Engineered lumber does everything solid-sawn lumber does, except better. It's stronger, lighter, straighter, and more stable. But working with I-joists and laminated veneer lumber (LVL) is different than solid-sawn lumber, so check out these tips for getting better, faster results.

Beams and Rim Joists. When you hang joists off a built-up center-span LVL beam (or flush header), check the widths of the LVL components. I've seen these vary as much as 3/8 inch from one another, which is enough to throw a top-hung joist hanger out of line. When the hanger is off, it's difficult to set the joist properly. To compensate for this we assemble headers and beams and then power plane them flush to flatten the top edge, before installing hangers and joists.

OSB rim joists can vary in thickness. Moisture swells them quickly, which can affect your joist measurements and slow you down. The best strategy to avoid this is to schedule delivery of your rim joist material just in time to use it, and keep it as dry as possible until it's installed.

Storage. Manufacturers recommend storing I-joists on edge. If laid flat on uneven terrain, they can take on a wobble. Using layout marks on your floor sheathing helps you keep joists in line as you lay the sheathing.

Cutting. You don't have to, but we find it's easier to use guides for cutting I-joists.

Click here to read full article from Tools of the Trade

Related Articles
- Green Building Products Corning NY
The manufacturer's latest toilet technology is Kohler's precision-engineered Class Six flushing. The unit optimizes the power of jet action to remove bulk waste with 100% of the flushing water being fed through the rim, blending bulk removal and bowl washing.
- Festool Circ Saw and Guide Rail System Corning NY
- Ergonomic Principles of Forklift Design Corning NY
- Fasteners and Connectors Corning NY
- Engineered Lumber Corning NY
- Home Exterior Ideas Corning NY
- Frugal House Framing Corning NY
- Fighting Fastener Corrosion Corning NY
- Green Products - Product Reviews Corning NY
- Forklift Operation Corning NY